Time-to-build: Interrelated Investment And Labour Demand Modelling With Applications To Six Oecd Countries (lecture Notes In Economics And Mathematical Systems)
معرفی کتاب «Time-to-build: Interrelated Investment And Labour Demand Modelling With Applications To Six Oecd Countries (lecture Notes In Economics And Mathematical Systems)» نوشتهٔ Dr. Marga Peeters (auth.)، منتشرشده توسط نشر Springer-Verlag Berlin Heidelberg در سال 1995. این کتاب در فرمت pdf، زبان انگلیسی ارائه شده است.
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries. Front Matter....Pages I-IX Overview....Pages 1-7 Physical Capital Stock Investments and Labour Demand....Pages 9-34 Investment Gestation Lags....Pages 35-51 A Closed Form Solution for a Model with Time-to-Build and Adjustment Costs....Pages 53-102 Persistence, Asymmetries and Interrelation in Manufacturing Structures, Equipment and Labour Demand....Pages 103-140 Interrelations in Physical Capital Stock, Labour and Inventory Investments....Pages 141-169 Summary, Conclusions and Shortcomings....Pages 171-182 Back Matter....Pages 183-206
دانلود کتاب Time-to-build: Interrelated Investment And Labour Demand Modelling With Applications To Six Oecd Countries (lecture Notes In Economics And Mathematical Systems)