وبلاگ بلیان

Review of Electricity Supply and Demand in Southeast Europe

معرفی کتاب «Review of Electricity Supply and Demand in Southeast Europe» نوشتهٔ Varadarajan Atur; David Kennedy، منتشرشده توسط نشر World Bank Publications در سال 2003. این کتاب در فرمت pdf، زبان انگلیسی ارائه شده است.

This paper reviews the power sector demand-supply balance in Southeastern Europe (SEE), covering Albania, Bosnia and Herzegovina, Bulgaria, Croatia, Former Yugoslav Republic of Macedonia, Romania, and Serbia and Montenegro (including Kosovo). The paper first looks at the actual balance over the period 1991-2001. After that, the forecast balance to 2012 is reviewed. The analysis is based on aggregated country level demand and capacity data provided by the electric utilities and supplemented drawing on published sources. The context for the paper is the agreement between the countries above, together with Greece and Turkey, to form a South Eastern Europe Regional Electricity Market (SEEREM).1 The objective is to identify the magnitude of generation investments to be made in the evolving market. The paper also proposes mechanisms to reduce investment requirements, namely energy efficiency improvements and increased trade, and provides a brief assessment of technical and institutional barriers to trade. The preliminary conclusion of the paper is that additional generating capacity of around 4,500 MW will be required over the next ten years, together with substantial rehabilitation of existing plant. The associated financing requirement would be well in excess of $5 billion. However, these figures reflect a significant degree of national energy self sufficiency. It is likely that less investment would be required if countries were to coordinate investments, with economies resulting due to heterogeneous resources, non coincidental peak requirements, and sharing of reserves. A regional least cost expansion plan is currently being developed as a follow up to the present study; this new study is to be financed by the EC and co-managed by the World Bank. The institutional framework to support increased trade is being developed as part of the SEEREM Annotation 'Review of Electricity Supply and Demand in Southeast Europe' is part of the World Bank Working Paper series. These papers are published to communicate the results of the Bank's ongoing research and to stimulate public discussion. This paper reviews the power sector demand-supply balance in Southeastern Europe, covering Albania, Bosnia and Herzegovina, Bulgaria, Croatia, Former Yugoslav Republic of Macedonia, Romania, and Serbia and Montenegro (including Kosovo), and identifies the magnitude of generation investments needed in this evolving market. It proposes mechanisms to reduce investment requirements, namely energy efficiency improvements and increased trade, and provides a brief assessment of technical and institutional barriers to trade "The context for this paper is the agreement among Albania, Bosnia and Herzegovina, Bulgaria, Croatia, Former Yugoslav Republic of Macedonia, Greece, Romania, Serbia and Montenegro, and Turkey to form a regional electricity market, soon to be joined by Italy. The study identifies the magnitude of electricity generation investment needed in the evolving market. The paper also proposes mechanisms to reduce those investment requirements via improved efficiency and increased trade - providing an assessment of technical and institutional barriers to electricity trade. It suggests that less investment will be required if countries coordinated investments and shared reserves during noncoincidental peak periods."--Jacket
دانلود کتاب Review of Electricity Supply and Demand in Southeast Europe