How Megaprojects Are Damaging Nigeria and How to Fix It : A Practical Guide to Mastering Very Large Government Projects

معرفی کتاب «How Megaprojects Are Damaging Nigeria and How to Fix It : A Practical Guide to Mastering Very Large Government Projects» نوشتهٔ Jimoh Ibrahim, Christoph Loch, Kishore Sengupta، منتشرشده توسط نشر Palgrave Macmillan در سال 2022. این کتاب در فرمت pdf، زبان انگلیسی ارائه شده است.

Since 1960, two-thirds of very large governmental projects in Nigeria have not only failed, but been abandoned mid-course. This presents a bigger failure rate than mega projects elsewhere, and yet there is no available data or analysis to help us understand the reasons behind such failures. This book provides an authoritative examination into why very large projects in Nigeria have failed so badly, and provides practical recommendations on how the Nigerian government can improve its project performance. Drawing on data from 38 very large projects (19 completed and 19 abandoned) with a total budget of over $25B, this book presents detailed analysis of these projects and in-depth case studies 11 of the projects, and presents lessons for improvement. Through this, the authors have identified a small number of key success drivers, and argue that making moderate improvements on any of them would, on average, save hundreds of millions of dollars on one large project alone. This book is a game-changer in the management of government mega projects in Nigeria. With clear implications for other developing economies, this is a vital resource for project management practitioners, executives and civil servants. This is an open access book. Preface Contents About the Authors List of Figures List of Tables 1: Introduction: The Project Abandonment Problem References 2: What We Know About the Management of Very Large Projects 2.1 Project Success Factors as Lists 2.2 The Project Success Frameworks of Miller and Lessard and Morris and Hough 2.2.1 Miller and Lessard (2000) 2.2.2 Morris and Hough (1987) 2.3 The Nigerian Context 2.4 The Extended Theoretical Framework 2.5 What About Corruption? References 3: Structure of the Investigation 3.1 Overview of the Approach Taken in This Study 3.2 Construction and Execution of the Survey 3.3 Construction of the Sample of Projects 3.4 Construction of the Case Studies Appendix: Full Questionnaire as It Was Administered Our Request Project Variables Section A: Background Information Section B: We are asking 40 questions that relate to the methods and structures with which the project was managed. (Circle the number that corresponds to your reaction/estimation or fill out the text.) A. Governance B. Project Initiation C. Project Execution References 4: A Description of the 38 Matched Projects 4.1 Lagos-Ibadan Express Road 4.2 Lagos-Badagry Express Road 4.3 Third Mainland Bridge 4.4 Second Niger Bridge 4.5 Egbin Power Station 4.6 Calabar Power Station 4.7 Zungeru Hydropower Plant 4.8 Delta State (Oghareki) Power Plant 4.9 Shiroro Hydroelectric Power Station 4.10 Omoku Power Plant Station 4.11 Mambilla Hydroelectric Power 4.12 Ajaokuta Steel Project 4.13 Kanji Dam 4.14 Otukpo Dam 4.15 Nigeria Satellite 2 4.16 Nigeria Satellite 1 4.17 Airtel Nigeria 4.18 Nigerian Telecommunications Limited (NITEL) 4.19 Godswill Akpabio International Stadium 4.20 (Samuel) Ogbemudia Stadium 4.21 Abuja International Airport 4.22 Lagos MMA2 Airport 4.23 Yenagoa International Cargo Airport 4.24 Jigawa Airport Project 4.25 Tin Can Island Port 4.26 Calabar Seaport 4.27 Victoria Garden City (VGC) Housing Estate 4.28 Festac Town Federal Housing Estate 4.29 1004 Housing Estate 4.30 Abuja Mass Federal Housing Project 4.31 Olusegun Obasanjo Presidential Library 4.32 Abuja National Library 4.33 Nigerian Youth Empowerment Scheme (N-Power) 4.34 Nigeria Subsidy Reinvestment and Empowerment Programme (SURE-P) 4.35 Lagos State Waste Management Authority (LAWMA) 4.36 Cleaner Lagos Initiative (Visionscape) 4.37 University College Teaching Hospital (UCH) Ibadan 4.38 University of Abuja Teaching Hospital (UATH) References 5: Insights from the Analysis of the Questionnaires 5.1 Variable Distributions and Variable Capability to Detect Differences Across Projects 5.1.1 Each Respondent Type Adds Unique Perspectives and Information 5.1.2 The Variables Capture Robust Differences Between Abandoned and Completed Projects 5.2 Condensing Variables into Aggregated Success Factors 5.2.1 Approach 5.2.2 Identifying the Factors 5.3 Econometric Prediction of Project Completion 5.4 Econometric Prediction of Cost and Schedule Overruns for Completed Projects 5.4.1 Effect of Variables on Budget Overruns 5.4.2 Effect of Variables on Schedule Overruns 5.5 The Corrosive Effect of Corruption Appendix 1 Correlations Among Independent Variables Across All 114 Responses Appendix 2 Factor Analysis Appendix 3 Specification of the Logistical Regression Appendix 4 The Logistical Completion Probability Regression by Respondent Group Appendix 5 Robustness Analysis: Cost Overrun Regressions by Respondent Group Appendix 6 Robustness Analysis: Schedule Overrun Regressions by Respondent Group 6: Two Library Projects 6.1 The National Library of Nigeria in Abuja: An Abandoned Project 6.1.1 Project Initiation 6.1.2 Contract Signature and Execution 6.1.3 Conclusion 6.2 Olusegun Obasanjo Presidential Library: A Completed Project 6.2.1 Project Initiation 6.2.2 Project Execution and Outcome 6.2.3 The Difference Between the Two Projects: In the Words of Former President Obasanjo References 7: Two Bridge Projects 7.1 The Second Niger Bridge: A Stalled Project 7.1.1 Project Initiation 7.1.2 Contract Disputes and Recontracting 7.1.3 Continued Stalling 7.1.4 Diagnosis of the Reasons for Failure, in the Words of (Former) President Jonathan 7.1.5 Conclusion 7.2 The Third Mainland Bridge: A Completed Project 7.2.1 Introduction 7.2.2 Starting and Stalling 7.2.3 Restarting the Project Under President Babangida 7.2.4 Project Execution and Outcome 7.2.5 Conclusion References 8: Two Power Plants 8.1 Egbin Power Station, Ikorodu Lagos State: A Completed Project 8.1.1 Initiation and Completion 8.1.2 Success Conditions and Challenges 8.1.3 Privatization and Trouble 8.2 The Calabar Odukpani Power Station: Completed but with Little Delivery 8.2.1 Project Initiation 8.2.2 Project Complications and Delays 8.2.3 Delivery of the Calabar Power Station in 2015 8.2.4 What Has Been Delivered? Lessons from the Project References 9: Two Express Road Rehabilitation Projects 9.1 The Lagos-Ibadan Express Road Rehabilitation: A Completed Project 9.1.1 Original Construction of the Express Road 9.1.2 A Reconstruction Project in a PPP Scheme 9.1.3 Restructuring the Project as a Government-Owned Project 9.1.4 Discussion 9.2 Lagos-Badagry Express Road Rehabilitation: A Stalled Project 9.2.1 Brief History 9.2.2 Was the Problem the Fault of the Contractor? 9.2.3 Dodgy Funding and Accounting 9.2.4 Protest, Additional Funding and Patching Up 9.2.5 Conclusion References 10: Two More Power Plants 10.1 The Zungeru Dam/Hydropower Plant: A (Soon-to-Be) Completed Project 10.1.1 Brief History 10.1.2 Enabling Factors of Completion 10.2 The Delta State Oghareki Power Plant: An Abandoned Project 10.2.1 Initiation 10.2.2 The Alleged Corruption 10.2.3 Implications References 11: The Ajaokuta Steel Project 11.1 Project Initiation 11.2 Project Construction and Cessation by 1988 11.3 The PPP Revival of 2000–2007 11.4 The State of the Asset 11.5 Conclusion References 12: Insights and Recommendations 12.1 Summary and Discussion of the Findings 12.2 Developing Solutions: Inspiration from Other Countries 12.3 Recommendations 12.3.1 Recommendations Part 1: Short-Term Changes 12.3.1.1 Diagnostic Review of Abandoned or Stalled Projects 12.3.1.2 Resolving Funding Challenges 12.3.1.3 World Bank/IMF Assistance 12.3.2 Recommendations Part 2: Longer-Term Structural Changes 12.3.2.1 Element 1: High-Level Political Priorities 12.3.2.2 Element 2: Portfolio Planning and Budgeting 12.3.2.3 Element 3: Institutional Changes 12.3.2.4 Element 4: Project Execution in the New Ministry 12.3.2.5 Element 5: Audit Bureau 12.3.2.6 Element 6: Fraud Prosecution 13: Conclusion: The Government Responsibility Index Since 1960, two-thirds of very large governmental projects in Nigeria have not only failed, but been abandoned mid-course. This presents a bigger failure rate than mega projects elsewhere, and yet there is no available data or analysis to help us understand the reasons behind such failures. This book provides an authoritative examination into why very large projects in Nigeria have failed so badly, and provides practical recommendations on how the Nigerian government can improve its project performance. Drawing on data from 38 very large projects (19 completed and 19 abandoned) with a total budget of over $25B, this book presents detailed analysis of these projects and in-depth case studies 11 of the projects, and presents lessons for improvement. Through this, the authors have identified a small number of key success drivers, and argue that making moderate improvements on any of them would, on average, save hundreds of millions of dollars on one large project alone. This open access book is a game-changer in the management of government mega projects in Nigeria. With clear implications for other developing economies, this is a vital resource for project management practitioners, executives and civil servants. Jimoh Ibrahim is a prominent businessman in Nigeria. He is also currently completing his Business Doctorate degree at the University of Cambridge, Judge Business School, and he is working on establishing a new University in Nigeria. Christoph Loch is Professor of Operations and Technology Management at the Cambridge Judge Business School. He served as the Dean of the school from 2011 to 2021. Kishore Sengupta is Professor of Operations and Technology Management at the Cambridge Judge Business School
دانلود کتاب How Megaprojects Are Damaging Nigeria and How to Fix It : A Practical Guide to Mastering Very Large Government Projects