Consensus on pre-commissioning stages for cogeneration and combined cycle power plants : an ASME research report

جلد کتاب Consensus on pre-commissioning stages for cogeneration and combined cycle power plants : an ASME research report

معرفی کتاب «Consensus on pre-commissioning stages for cogeneration and combined cycle power plants : an ASME research report» نوشتهٔ Roger W. Light، منتشرشده توسط نشر ASME Press;John Wiley & Sons Ltd در سال 2017. این کتاب در فرمت pdf، زبان انگلیسی ارائه شده است.

This publication is an important adjunct to several previously published documents prepared to inform, educate and assist the reader in adequately considering and planning for the many major activities involved in the design, construction and start-up of cogeneration and combined cycle power plants. Experience has shown that failure to consider the complex interrelationships between the various component systems can result in costly delays in project completion and turn over dates. Additionally, incorrect procedures and planning can result in damage or failure of key pieces of equipment or systems during subsequent operation. This consensus was prepared by a task group of this subcommittee under the leadership of Edward Beardwood. The task group consisted of representatives of manufacturers, operators and consultants involved with the planning, design, manufacture, operation and monitoring of industrial and utility boilers, steam generators and associated equipment and systems. The ASME Research and Technology Committee on Water and Steam in Thermal Systems will review, revise and reissue this document from time to time as necessary to comply with advances in technology in the design of these plants and the water treatment options. Prepared by Combined Cycle Task Group For the Water Technology Subcommittee of the ASME Research and Technology Committee On Water and Steam in Thermal Systems. This publication is an important adjunct to several previously published documents prepared to inform, educate and assist the reader in adequately considering and planning for the many major activities involved in the design, construction and start-up of cogeneration and combined cycle power plants. Experience has shown that failure to consider the complex interrelationships between the various component systems can result in costly delays in project completion and turn over dates. Additionally, incorrect procedures and planning can result in damage or failure of key pieces of equipment or systems during subsequent operation Content: Forward -- Acknowledgement -- Preface -- Section 1: Introduction -- Section 2: Scope -- Section 3: Avoiding premature failures -- Section 4: Project development considerations -- Section 5 Project design specifications -- Section 6: Off-site fabrication and assembly -- Section 7: On-site construction -- Section 8: Makeup water treatment plant start-up -- Section 9: Initial hydrostatic test (hydro) and high-velocity flush (HVF) -- Section 10: Heat recovery stream generator cleaning -- Section 11: Steam blow -- Section 12: Turbine -- Section 13: Steam turbine commissioning -- Section 14: Start-up, shutdown, and lay-up -- Section 15: Glossary of terms - Section 17: Figures and tables -- Section 18: References -- Appendix A: Damage/corrosion mechanisms.
دانلود کتاب Consensus on pre-commissioning stages for cogeneration and combined cycle power plants : an ASME research report